Session:   
Updated:   2026-03-17

Home - Bills - Bill - Authors - Dates - Locations - Analyses - Organizations

Measure
Authors Schultz  
Subject Electrical corporations: grid utilization metric.
Relating To relating to electricity.
Title An act to add Section 762.6 to the Public Utilities Code, relating to electricity.
Last Action Dt 2026-03-03
State Amended Assembly
Status In Committee Process
Flags
Vote Req Approp Fiscal Cmte Local Prog Subs Chgs Urgency Tax Levy Active?
Majority No Yes Yes None No No Y
i
Leginfo Link  
Bill Actions
2026-03-04     Re-referred to Com. on U. & E.
2026-03-03     From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.
2026-03-02     Referred to Com. on U. & E.
2026-02-14     From printer. May be heard in committee March 16.
2026-02-13     Read first time. To print.
Versions
Amended Assembly     2026-03-03
Introduced     2026-02-13
Analyses TBD
Latest Text Bill Full Text
Latest Text Digest

Existing law vests the Public Utilities Commission with regulatory authority over public utilities, including electrical corporations. Existing law authorizes the commission to fix the rates and charges for every public utility and requires that those rates and charges be just and reasonable.

This bill would require the commission, on or before December 31, 2027, to establish a grid utilization metric that calculates electrical load as a percentage of rated capacity, as specified. The bill would require each large electrical corporation, each calendar quarter, to submit a publicly available report to the commission with the results of the large electrical corporation’s grid utilization metric calculations, as specified. The bill would require the commission to annually establish a minimum value for the grid utilization metric within each large electrical corporation’s distribution grid, and would require that the grid utilization metric minimum value increase annually, as provided. The bill would require the commission to establish financial performance-based incentives or disincentives correlated with achieving the grid utilization metric minimum value, as specified, and would require each large electrical corporation, on or before July 31, 2028, to propose grid utilization programs to achieve the grid utilization metric minimum value, as specified.

Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the commission is a crime.

Because the above-described provisions would be part of the act and a violation of a commission action implementing the bill’s requirements would be a crime, this bill would impose a state-mandated local program.