| Last Version Text |
<?xml version="1.0" ?>
<ns0:MeasureDoc xmlns:html="http://www.w3.org/1999/xhtml" xmlns:ns0="http://lc.ca.gov/legalservices/schemas/caml.1#" xmlns:ns3="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" version="1.0" xsi:schemaLocation="http://lc.ca.gov/legalservices/schemas/caml.1# xca.1.xsd">
<ns0:Description>
<ns0:Id>20250AB__130199INT</ns0:Id>
<ns0:VersionNum>99</ns0:VersionNum>
<ns0:History>
<ns0:Action>
<ns0:ActionText>INTRODUCED</ns0:ActionText>
<ns0:ActionDate>2025-02-21</ns0:ActionDate>
</ns0:Action>
</ns0:History>
<ns0:LegislativeInfo>
<ns0:SessionYear>2025</ns0:SessionYear>
<ns0:SessionNum>0</ns0:SessionNum>
<ns0:MeasureType>AB</ns0:MeasureType>
<ns0:MeasureNum>1301</ns0:MeasureNum>
<ns0:MeasureState>INT</ns0:MeasureState>
</ns0:LegislativeInfo>
<ns0:AuthorText authorType="LEAD_AUTHOR">Introduced by Assembly Member Petrie-Norris</ns0:AuthorText>
<ns0:Authors>
<ns0:Legislator>
<ns0:Contribution>LEAD_AUTHOR</ns0:Contribution>
<ns0:House>ASSEMBLY</ns0:House>
<ns0:Name>Petrie-Norris</ns0:Name>
</ns0:Legislator>
</ns0:Authors>
<ns0:Title> An act to amend Sections 330, 331, 335, 339, 340, 341.2, 341.5, 361, 365, 367, 373, 376, and 390 of, to repeal Sections 338 and 367.7 of, and to repeal Article 4 (commencing with Section 355) of Chapter 2.3 of Part 1 of Division 1 of, the Public Utilities Code, relating to electricity.</ns0:Title>
<ns0:RelatingClause>electricity</ns0:RelatingClause>
<ns0:GeneralSubject>
<ns0:Subject>Electricity: Power Exchange.</ns0:Subject>
</ns0:GeneralSubject>
<ns0:DigestText>
<html:p>Existing law establishes a Power Exchange as a nonprofit public benefit corporation to provide an efficient competitive auction, open on a nondiscriminatory basis to all suppliers of electricity, that meets the loads of all of its customers at efficient prices.</html:p>
<html:p>This bill would abolish the Power Exchange and would make various conforming changes.</html:p>
</ns0:DigestText>
<ns0:DigestKey>
<ns0:VoteRequired>MAJORITY</ns0:VoteRequired>
<ns0:Appropriation>NO</ns0:Appropriation>
<ns0:FiscalCommittee>NO</ns0:FiscalCommittee>
<ns0:LocalProgram>NO</ns0:LocalProgram>
</ns0:DigestKey>
<ns0:MeasureIndicators>
<ns0:ImmediateEffect>NO</ns0:ImmediateEffect>
<ns0:ImmediateEffectFlags>
<ns0:Urgency>NO</ns0:Urgency>
<ns0:TaxLevy>NO</ns0:TaxLevy>
<ns0:Election>NO</ns0:Election>
<ns0:UsualCurrentExpenses>NO</ns0:UsualCurrentExpenses>
<ns0:BudgetBill>NO</ns0:BudgetBill>
<ns0:Prop25TrailerBill>NO</ns0:Prop25TrailerBill>
</ns0:ImmediateEffectFlags>
</ns0:MeasureIndicators>
</ns0:Description>
<ns0:Bill id="bill">
<ns0:Preamble>The people of the State of California do enact as follows:</ns0:Preamble>
<ns0:BillSection id="id_9421355D-AF98-42DC-B5C2-049E168FD364">
<ns0:Num>SECTION 1.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'330.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 330 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_5E7D6CCA-D80F-4290-A305-6CBB3B436F85">
<ns0:Num>330.</ns0:Num>
<ns0:LawSectionVersion id="id_9EA109A5-8607-408E-A538-6E3283FCD916">
<ns0:Content>
<html:p>To provide guidance in carrying out this chapter, the Legislature finds and declares all of the following:</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
It is the intent of the Legislature that a cumulative rate reduction of at least 20 percent be achieved not later than April 1, 2002, for residential and small commercial customers, from the rates in effect on June 10, 1996. In determining that the April 1, 2002, rate reduction has been met, the commission shall exclude the costs of the competitively procured electricity and the costs associated with the rate reduction bonds, as defined in
Section 840.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
The people, businesses, and institutions of California spend nearly twenty-three billion dollars ($23,000,000,000) annually on electricity, so that reductions in the price of electricity would significantly benefit the economy of the state and its residents.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
The commission has opened rulemaking and investigation proceedings with regard to restructuring California’s electricity industry and reforming utility regulation.
</html:p>
<html:p>
(d)
<html:span class="EnSpace"/>
The commission has found, after an extensive public review process, that the interests of ratepayers and the state as a whole will be best served by moving from the regulatory framework existing on January 1, 1997, in which retail electricity service is provided principally by electrical corporations subject to an obligation to provide ultimate consumers in exclusive service territories with reliable electric service at regulated rates, to a framework under which competition would be allowed in the supply of electricity and customers would be allowed to have the right to choose their supplier of
electricity.
</html:p>
<html:p>
(e)
<html:span class="EnSpace"/>
Competition in the electric generation market will encourage innovation, efficiency, and better service from all market participants, and will permit the reduction of costly regulatory oversight.
</html:p>
<html:p>
(f)
<html:span class="EnSpace"/>
The delivery of electricity over transmission and distribution systems is currently regulated, and will continue to be regulated to ensure system safety, reliability, environmental protection, and fair access for all market participants.
</html:p>
<html:p>
(g)
<html:span class="EnSpace"/>
Reliable electric service is of utmost importance to the safety, health, and welfare of the state’s citizenry and economy. It is the intent of the Legislature that electric industry restructuring should enhance the reliability of the interconnected regional transmission systems, and provide strong coordination and enforceable
protocols for all users of the power grid.
</html:p>
<html:p>
(h)
<html:span class="EnSpace"/>
It is important that sufficient supplies of electric generation will be available to maintain the reliable service to the citizens and businesses of the state.
</html:p>
<html:p>
(i)
<html:span class="EnSpace"/>
Reliable electric service depends on conscientious inspection and maintenance of transmission and distribution systems. To continue and enhance the reliability of the delivery of electricity, the Independent System Operator and the commission, respectively, should set inspection, maintenance, repair, and replacement standards.
</html:p>
<html:p>
(j)
<html:span class="EnSpace"/>
It is the intent of the Legislature that California enter into a compact with western region states. That compact should require the publicly and investor-owned utilities located in those states, that sell energy to California retail customers, to adhere to enforceable standards and
protocols to protect the reliability of the interconnected regional transmission and distribution systems.
</html:p>
<html:p>
(k)
<html:span class="EnSpace"/>
To achieve meaningful wholesale and retail competition in the electric generation market, it is essential to do all of the following:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
Separate monopoly utility transmission functions from competitive generation functions, through development of independent, third-party control of transmission access and pricing.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Permit all customers to choose from among competing suppliers of
electricity.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
Provide customers and suppliers with open, nondiscriminatory, and comparable access to transmission and distribution services.
</html:p>
<html:p>
(
<html:i>l</html:i>
)
<html:span class="EnSpace"/>
The commission has properly concluded that:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
This competition will best be introduced by the creation of an Independent System Operator.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Generation of electricity should be open to competition.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
There is a need to ensure that no participant in these new
market institutions has the ability to exercise significant market power so that operation of the new market institutions would be distorted.
</html:p>
<html:p>
(4)
<html:span class="EnSpace"/>
These new market institutions should commence simultaneously with the phase in of customer choice, and the public will be best served if these institutions and the nonbypassable transition cost recovery mechanism referred to in subdivisions (s) to (w), inclusive, are in place simultaneously and no later than January 1, 1998.
</html:p>
<html:p>
(m)
<html:span class="EnSpace"/>
It is the intention of the Legislature that California’s publicly owned electric utilities and investor-owned electric utilities should commit control of their transmission facilities to the Independent System Operator. These utilities should jointly advocate to the Federal Energy Regulatory Commission a pricing methodology for the Independent System Operator that results in an equitable return on capital
investment in transmission facilities for all Independent System Operator participants.
</html:p>
<html:p>
(n)
<html:span class="EnSpace"/>
Opportunities to acquire electricity in the competitive market must be available to California consumers as soon as practicable, but no later than January 1, 1998, so that all customers can share in the benefits of competition.
</html:p>
<html:p>
(o)
<html:span class="EnSpace"/>
Under the existing regulatory framework, California’s electrical corporations were granted franchise rights to provide electricity to consumers in their service territories.
</html:p>
<html:p>
(p)
<html:span class="EnSpace"/>
Consistent with federal and state policies, California electrical corporations invested in power plants and entered
into contractual obligations in order to provide reliable electrical service on a nondiscriminatory basis to all consumers within their service territories who requested service.
</html:p>
<html:p>
(q)
<html:span class="EnSpace"/>
The cost of these investments and contractual obligations are currently being recovered in electricity rates charged by electrical corporations to their consumers.
</html:p>
<html:p>
(r)
<html:span class="EnSpace"/>
Transmission and distribution of electricity remain essential services imbued with the public interest that are provided over facilities owned and maintained by the state’s electrical corporations.
</html:p>
<html:p>
(s)
<html:span class="EnSpace"/>
It is proper to allow electrical corporations an opportunity to
continue to recover, over a reasonable transition period, those costs and categories of costs for generation-related assets and obligations, including costs associated with any subsequent renegotiation or buyout of existing generation-related contracts, that the commission, before December 20, 1995, had authorized for collection in rates and that may not be recoverable in market prices in a competitive generation market, and appropriate additions incurred after December 20, 1995, for capital additions to generating facilities existing as of December 20, 1995, that the commission determines are reasonable and should be recovered, if
the costs are necessary to maintain those facilities through December 31, 2001. In determining the costs to be recovered, it is appropriate to net the negative value of above market assets against the positive value of below market assets.
</html:p>
<html:p>
(t)
<html:span class="EnSpace"/>
The transition to a competitive generation market should be orderly, protect electric system reliability, provide the investors in these electrical corporations with a fair opportunity to fully recover the costs associated with commission approved generation-related assets and obligations, and be completed as expeditiously as possible.
</html:p>
<html:p>
(u)
<html:span class="EnSpace"/>
The transition to expanded customer choice, competitive markets, and performance-based
ratemaking as described in Decision 95-12-063, as modified by Decision 96-01-009, of the
commission, can produce hardships for employees who have dedicated their working lives to utility employment. It is preferable that any necessary reductions in the utility workforce directly caused by electrical restructuring be accomplished through offers of voluntary severance, retraining, early retirement, outplacement, and related benefits. Whether workforce reductions are voluntary or involuntary, reasonable costs associated with these sorts of benefits should be included in the competition transition charge.
</html:p>
<html:p>
(v)
<html:span class="EnSpace"/>
Charges associated with the transition should be collected over a specific period of time on a nonbypassable basis and in a manner that does not result in an increase in rates to customers
of electrical corporations. In order to insulate the policy of nonbypassability against incursions, if exemptions from the competition transition charge are granted, a firewall shall be created that segregates recovery of the cost of exemptions as follows:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
The cost of the competition transition charge exemptions granted to members of the combined class of residential and small commercial customers shall be recovered only from those customers.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
The cost of the competition transition charge exemptions granted to members of the combined class of customers other than residential and small commercial customers shall be recovered only from those customers. The commission shall retain existing cost allocation authority provided that the firewall and rate freeze principles are not violated.
</html:p>
<html:p>
(w)
<html:span class="EnSpace"/>
It is the intent of the
Legislature to require and enable electrical corporations to monetize a portion of the competition transition charge for residential and small commercial consumers so that these customers will receive rate reductions of no less than 10 percent for 1998 continuing through 2002. Electrical corporations shall, by June 1, 1997, or earlier, secure the means to finance the competition transition charge by applying concurrently for financing orders from the commission and for rate reduction bonds from the California Infrastructure and Economic Development Bank.
</html:p>
<html:p>
(x)
<html:span class="EnSpace"/>
California’s electrical corporations provide substantial benefits to all
Californians, including employment and support of the state’s economy. Restructuring the electric services industry pursuant to the act that added this chapter will continue these benefits, and will also offer meaningful and immediate rate reductions for residential and small commercial customers, and facilitate competition in the supply of electricity.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_CF483787-47F7-4FF7-B414-128B485CFDF5">
<ns0:Num>SEC. 2.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'331.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 331 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_98180F3C-19D4-4F4B-9E55-8A8E10363945">
<ns0:Num>331.</ns0:Num>
<ns0:LawSectionVersion id="id_6494B306-0EF1-40B8-B99E-1B27F1F78D7A">
<ns0:Content>
<html:p>The definitions set forth in this section shall govern the construction of this chapter.</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
“Aggregator” means a marketer, broker, public agency, city, county, or special district, that combines the loads of multiple end-use customers in facilitating the sale and purchase of electricity, transmission, and other services on behalf of these
customers.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
“Broker” means an entity that arranges the sale and purchase of electricity, transmission, and other services between buyers and sellers, but does not take title to any of the electricity sold.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
“Direct transaction” means a contract between any one or more electric generators, marketers, or brokers of
electricity and one or more retail customers providing for the purchase and sale of electricity or any ancillary services.
</html:p>
<html:p>
(d)
<html:span class="EnSpace"/>
“Fire wall” means the line of demarcation separating residential and small commercial customers from all other customers as described in subdivision (e) of Section 367.
</html:p>
<html:p>
(e)
<html:span class="EnSpace"/>
“Marketer” means
an entity that buys electricity, transmission, and other services from traditional utilities and other suppliers, and then resells those services at wholesale or to an end-use customer.
</html:p>
<html:p>
(f)
<html:span class="EnSpace"/>
“Microcogeneration facility” means a cogeneration facility of less than one megawatt.
</html:p>
<html:p>
(g)
<html:span class="EnSpace"/>
“Restructuring trusts” means the tax-exempt public benefit trust established
by Decision 96-08-038 of the commission to provide for design and development of the hardware and software systems for
the Independent System Operator and that may undertake other activities, as needed, as ordered by the commission.
</html:p>
<html:p>
(h)
<html:span class="EnSpace"/>
“Small commercial customer” means a customer that has a maximum peak demand of less than 20 kilowatts.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_9CC26F0F-C92D-4FF3-B211-D58EE47BED8E">
<ns0:Num>SEC. 3.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'335.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 335 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_2A94A574-26B4-461B-BF7A-1BEBECB57049">
<ns0:Num>335.</ns0:Num>
<ns0:LawSectionVersion id="id_1B32938D-5186-410B-B93B-6A5805866B93">
<ns0:Content>
<html:p>To ensure that the interests of the people of California are served, a five-member Electricity Oversight Board is hereby created as provided in Section 336. For purposes of this chapter, any reference to the Oversight Board shall mean the Electricity Oversight Board. Its functions shall be all of the following:</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
To oversee the Independent System
Operator.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
To serve as an appeal board for majority decisions of the Independent System Operator governing board, as they relate to matters subject to exclusive state jurisdiction, as specified in Section 339.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
To investigate any matter related to the wholesale market for electricity to ensure that the interests of California’s citizens and consumers are served, protected, and represented in relation to the availability of electric transmission and generation and related costs, during periods of peak demand.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_E720F6E9-961B-4F2D-8978-563F7B9945C3">
<ns0:Num>SEC. 4.</ns0:Num>
<ns0:ActionLine action="IS_REPEALED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'338.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 338 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is repealed.
</ns0:ActionLine>
<ns0:Fragment/>
</ns0:BillSection>
<ns0:BillSection id="id_986F16E6-F3B4-4E2F-BC07-CB5720217761">
<ns0:Num>SEC. 5.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'339.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 339 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_9EBD6B06-E3BD-43DF-8A52-9EAF65C377B2">
<ns0:Num>339.</ns0:Num>
<ns0:LawSectionVersion id="id_EA87048C-C1F6-45E0-9E95-43E7F2E82156">
<ns0:Content>
<html:p>
(a)
<html:span class="EnSpace"/>
The Oversight Board is the appeal board for majority decisions of the Independent System Operator governing board relating to matters that are identified in subdivision (b) as they pertain to the Independent System Operator.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
The following matters are subject to California’s exclusive jurisdiction:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
Selections by California of governing board members, as described in Sections 335, 337, and 338.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Matters pertaining to retail electric service or retail sales of
electricity.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
Ensuring that the purposes and functions of the Independent System Operator are consistent with the purposes and functions of California nonprofit public benefit corporations, including duties of care and conflict of interest standards for directors of the corporation.
</html:p>
<html:p>
(4)
<html:span class="EnSpace"/>
State functions assigned to the Independent System Operator under state law.
</html:p>
<html:p>
(5)
<html:span class="EnSpace"/>
Open
meeting standards and meeting notice requirements.
</html:p>
<html:p>
(6)
<html:span class="EnSpace"/>
Appointment of advisory representatives representing state interests.
</html:p>
<html:p>
(7)
<html:span class="EnSpace"/>
Public access to corporate records.
</html:p>
<html:p>
(8)
<html:span class="EnSpace"/>
The amendment of bylaws relevant to these matters.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
Only members of the Independent System Operator governing board may appeal a majority decision of the Independent System Operator related to any of the matters specified in subdivision (b) to the Oversight Board.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_BFC4BEE7-A927-4D07-9938-434D82BEE7DA">
<ns0:Num>SEC. 6.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'340.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 340 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_AAD41999-14E9-4CAF-ACA2-DFFDB1C843B2">
<ns0:Num>340.</ns0:Num>
<ns0:LawSectionVersion id="id_240FDBBB-6F91-4B6A-BF7C-68553A60F1A1">
<ns0:Content>
<html:p>The Oversight Board shall take the steps that are necessary to ensure the earliest possible incorporation of the Independent System Operator as an incorporated public benefit, nonprofit corporation under the Corporations Code.</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_AF889CC2-A019-427E-9335-58CBB552819C">
<ns0:Num>SEC. 7.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'341.2.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 341.2 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_0A4E0436-3A11-4E45-A8B8-96CFB2A429B1">
<ns0:Num>341.2.</ns0:Num>
<ns0:LawSectionVersion id="id_AECD36C6-C1F9-40BB-952A-59A5071B769A">
<ns0:Content>
<html:p>The Bagley-Keene Open Meeting Act (Article 9 (commencing with Section 11120) of Chapter 1 of Part 1 of Division 3 of Title 2 of the Government Code) applies to meetings of the Oversight Board. In addition to the allowances of that act, the Oversight Board may hold a closed session to consider a matter based on information that has received a grant of confidential status pursuant to regulations of the Oversight
Board and any action taken on that matter shall be taken by vote in an open session.</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_71AA8934-1F72-4E27-B172-94DCFC8268BF">
<ns0:Num>SEC. 8.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'2.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'341.5.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 341.5 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_7BCB47C3-DB8A-4771-BBE4-03FA1D8EE3DF">
<ns0:Num>341.5.</ns0:Num>
<ns0:LawSectionVersion id="id_FC03C30A-7E75-4FC1-B00E-FC4187F228F0">
<ns0:Content>
<html:p>
(a)
<html:span class="EnSpace"/>
The Independent System Operator bylaws shall contain provisions that identify those matters specified in subdivision (b) of Section 339 as matters within state jurisdiction. The bylaws shall also contain provisions that state that California’s bylaws approval function with respect to the matters specified in subdivision (b) of Section 339 shall not preclude the Federal Energy Regulatory Commission from taking any action necessary to address undue discrimination or other violations of the
Federal Power Act (16 U.S.C.A. Sec. 791a et seq.) or to exercise any other commission responsibility under the Federal Power Act. In taking any such action, the Federal Energy Regulatory Commission shall give due respect to California’s jurisdictional interests in the functions of the Independent System Operator and to attempt to accommodate state interests to the extent those interests are not inconsistent with the Federal Energy Regulatory Commission’s statutory responsibilities. The bylaws shall state that any future agreement regarding the apportionment of the Independent System Operator board appointment function among participating states associated with the expansion of the Independent System Operator
into a multistate entity shall be filed with the Federal Energy Regulatory Commission pursuant to Section 205 of the Federal Power Act (16 U.S.C.A. Sec. 824d).
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
Any necessary bylaw changes to implement Section 335, 337, 338, 339, or subdivision (a) of this section, or changes required pursuant to an agreement as contemplated by subdivision (a) with a participating state for a regional organization, shall be effective upon
approval of the respective governing boards and the Oversight Board and acceptance for filing by the Federal Energy Regulatory Commission.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_162359BA-B809-403A-83A3-3E3760954D0C">
<ns0:Num>SEC. 9.</ns0:Num>
<ns0:ActionLine action="IS_REPEALED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'4.'%5D)" ns3:label="fractionType: LAW_SPREAD||commencingWith: 355">
Article 4 (commencing with Section 355) of Chapter 2.3 of Part 1 of Division 1 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is repealed.
</ns0:ActionLine>
<ns0:Fragment/>
</ns0:BillSection>
<ns0:BillSection id="id_4B599044-0D0C-48B1-96D8-8C01DAE015A5">
<ns0:Num>SEC. 10.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'361.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 361 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_B14F87CC-2F34-478F-965A-A0B68AABA46F">
<ns0:Num>361.</ns0:Num>
<ns0:LawSectionVersion id="id_6AF0E995-7C3B-45BB-827C-F3501EE051CB">
<ns0:Content>
<html:p>The commission shall ensure that any funds secured by the restructuring trusts established for the purpose of developing the Independent System Operator shall be placed at the disposal of the Independent System Operator.</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_74F6CD0E-49A3-4066-AD02-CFA41217F682">
<ns0:Num>SEC. 11.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'365.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 365 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_93B9AD47-A4A6-49D9-83FC-BB1FA0CD496D">
<ns0:Num>365.</ns0:Num>
<ns0:LawSectionVersion id="id_AB760557-D36A-4D62-98FF-BF23C6AFB99A">
<ns0:Content>
<html:p>The actions of the commission pursuant to this chapter shall be consistent with the findings and declarations contained in Section 330. In addition, the commission shall do all of the following:</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
Facilitate the efforts of the state’s electrical corporations to develop and obtain authorization from the Federal Energy Regulatory Commission for the creation and operation of an Independent System Operator for the determination of which transmission and distribution facilities are subject to the exclusive jurisdiction of the commission, and for approval, to the extent necessary, of the cost recovery mechanism established as provided
in Sections 367 to 376, inclusive. The commission shall also participate fully in all proceedings before the Federal Energy Regulatory Commission in connection with the Independent System Operator and shall encourage the Federal Energy Regulatory Commission to adopt protocols and procedures that strengthen the reliability of the interconnected transmission grid, encourage all publicly owned utilities in California to become full participants, and maximize enforceability of such protocols and procedures by all market participants.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
(1)
<html:span class="EnSpace"/>
Authorize direct transactions between electricity suppliers and end use customers, subject to implementation of the nonbypassable charge referred to in Sections 367 to 376, inclusive. Direct transactions shall commence simultaneously with the start of an Independent
System Operator
referred to in subdivision (a). The simultaneous commencement shall occur as soon as practicable, but no later than January 1, 1998. The commission shall develop a phase-in schedule at the conclusion of which all customers shall have the right to engage in direct transactions. Any phase-in of customer eligibility for direct transactions ordered by the commission shall be equitable to all customer classes and accomplished as soon as practicable, consistent with operational and other technological considerations, and shall be completed for all customers by January 1, 2002.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Customers shall be eligible for direct access irrespective of any direct access phase-in implemented pursuant to this section if at least one-half of that customer’s electrical load is supplied by energy from a renewable resource provider certified pursuant to Section 383, provided however that nothing in this section shall provide for direct access for
electric consumers served by municipal utilities unless so authorized by the governing board of that municipal utility.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_E8C7BE9C-17DF-43E2-9FE9-3E381D2F9FE0">
<ns0:Num>SEC. 12.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'367.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 367 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_65F7A915-F5DD-4B1E-9B5C-8D946951E844">
<ns0:Num>367.</ns0:Num>
<ns0:LawSectionVersion id="id_0DDF35E5-FF47-4CF9-8313-7C34B6DA2BFC">
<ns0:Content>
<html:p>The commission shall identify and determine those costs and categories of costs for generation-related assets and obligations, consisting of generation facilities, generation-related regulatory assets, nuclear settlements, and power purchase contracts, including, but not limited to, restructurings, renegotiations, or terminations thereof approved by the commission, that were being collected in commission-approved rates on December 20, 1995, and that may become uneconomic as a result of a competitive generation market, in that these costs may not be recoverable in market prices in a competitive market, and
appropriate costs incurred after December 20, 1995, for capital additions to generating facilities existing as of December 20, 1995, that the commission determines are reasonable and should be recovered, if these additions are necessary to maintain the facilities through December 31, 2001. These uneconomic costs shall include transition costs as defined in subdivision (f) of Section 840, and shall be recovered from all customers or in the case of fixed transition amounts, from the customers specified in subdivision (a) of Section 841, on a nonbypassable basis and shall:</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
Be amortized over a reasonable time period, including collection on an accelerated basis, consistent with not increasing rates for any rate schedule, contract, or tariff option above the levels in effect on June 10, 1996; provided that, the recovery shall not extend beyond December 31, 2001, except as follows:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
Costs associated with employee-related transition costs as set forth in
subdivision (b) of Section 375 shall continue until fully collected; provided, however, that the cost collection shall not extend beyond December 31, 2006.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Power purchase contract obligations shall continue for the duration of the contract. Costs associated with any buy-out, buy-down, or renegotiation of the contracts shall continue to be collected for the duration of any agreement governing the buy-out, buy-down, or renegotiated contract; provided, however, no power purchase contract shall be extended as a result of the buy-out, buy-down, or renegotiation.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
Costs associated with contracts approved by the commission to settle issues associated with the Biennial Resource Plan Update may be collected through March 31, 2002; provided that only 80 percent of the balance of the costs remaining after December 31, 2001, shall be eligible for recovery.
</html:p>
<html:p>
(4)
<html:span class="EnSpace"/>
Nuclear incremental cost incentive plans for the San Onofre nuclear generating station shall continue for the full term as authorized by the commission in Decision 96-01-011 and Decision 96-04-059; provided that the recovery shall not extend beyond December 31, 2003.
</html:p>
<html:p>
(5)
<html:span class="EnSpace"/>
Costs associated with the exemptions provided in subdivision (a) of Section 374 may be collected through March 31, 2002, provided that only fifty million dollars ($50,000,000) of the balance of the costs remaining after December 31, 2001, shall be eligible for recovery.
</html:p>
<html:p>
(6)
<html:span class="EnSpace"/>
Fixed transition amounts, as defined in subdivision (d) of Section 840, may be recovered from the customers specified in subdivision (a) of Section 841 until all rate reduction bonds associated with the fixed transition amounts have been paid in full by the financing entity.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
Be based on a calculation mechanism that nets the negative value of all above market utility-owned generation-related assets against the positive value of all below market utility-owned generation related assets. For those assets subject to valuation, the valuations used for the calculation of the uneconomic portion of the net book value shall be determined not later than December 31, 2001, and shall be based on appraisal, sale, or other divestiture. The commission’s determination of the costs eligible for recovery and of the valuation of those assets at the time the assets are exposed to market risk or retired, in a proceeding under Section 455.5, 851, or otherwise, shall be final, and notwithstanding Section 1708 or any other law,
shall not be rescinded, altered, or amended.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
Be limited in the case of utility-owned fossil generation to the uneconomic portion of the net book value of the fossil capital investment existing as of January 1, 1998, and appropriate costs incurred after December 20, 1995, for capital additions to generating facilities existing as of December 20, 1995, that the commission determines are reasonable and should be recovered, if the additions are necessary to maintain the facilities through December 31, 2001.
All “going forward costs” of fossil plant operation, including operation and maintenance, administrative and general, fuel and fuel transportation costs, shall be recovered solely from contracts with the Independent System Operator, provided that for the purposes of this chapter, the following costs may be recoverable pursuant to this section:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
Commission-approved operating costs for particular utility-owned fossil powerplants or units, at particular times when reactive power/voltage support is not yet procurable at market-based rates in locations where it is deemed needed for the reactive power/voltage support by the Independent System Operator,
if
the units are otherwise authorized to recover market-based rates and if for an electrical corporation that is also a gas corporation and that serves at least four million customers as of December 20, 1995, the commission shall authorize the electrical corporation to retain any earnings from operations of the reactive power/voltage support plants or units and shall not require the utility to apply any portions to offset recovery of transition costs. Cost recovery under the cost recovery mechanism shall end on December 31, 2001.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
An electrical corporation that, as of December 20, 1995, served at least four million customers, and that was also a gas corporation that served less than four thousand customers, may recover, pursuant to this section, 100 percent of the uneconomic portion of the fixed costs paid under fuel and fuel transportation contracts that were executed before December 20, 1995, and were subsequently determined to be reasonable by the commission, or 100 percent of the buy-down or buy-out costs associated with the contracts to the extent the costs are determined to be reasonable by the commission.
</html:p>
<html:p>
(d)
<html:span class="EnSpace"/>
Be adjusted throughout the period through March 31, 2002, to track accrual and recovery of costs provided for in this subdivision. Recovery of
costs
before December 31, 2001, shall include a return as provided for in commission Decision 95-12-063, as modified by Decision 96-01-009, together with associated taxes.
</html:p>
<html:p>
(e)
<html:span class="EnSpace"/>
(1)
<html:span class="EnSpace"/>
Be allocated among the various classes of customers, rate schedules, and tariff options to ensure that costs are recovered from these classes, rate schedules, contract rates, and tariff options, including self-generation deferral, interruptible, and standby rate options in substantially the same proportion as similar costs are recovered as of June 10, 1996, through the regulated retail rates of the relevant electric utility, provided that there shall be a firewall segregating the recovery of the costs of competition transition charge exemptions such that the costs of competition transition charge exemptions
granted to members of the combined class of residential and small commercial customers shall be recovered only from these customers, and the costs of competition transition charge exemptions granted to members of the combined class of customers, other than residential and small commercial customers, shall be recovered only from these customers.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
Individual customers shall not experience rate increases as a result of the allocation of transition costs.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
The commission shall retain existing cost allocation authority, if the firewall and rate freeze principles are not violated.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_40D51F99-3A7A-48A1-B02A-BE2592FFC373">
<ns0:Num>SEC. 13.</ns0:Num>
<ns0:ActionLine action="IS_REPEALED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'367.7.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 367.7 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is repealed.
</ns0:ActionLine>
<ns0:Fragment/>
</ns0:BillSection>
<ns0:BillSection id="id_CD70D20F-2569-406B-A739-A4431EA4955F">
<ns0:Num>SEC. 14.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'373.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 373 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_E9A02AE1-2522-4347-AC10-7261B21DC2B0">
<ns0:Num>373.</ns0:Num>
<ns0:LawSectionVersion id="id_B75CAEA7-75D5-4C81-A503-1A6DEB78496D">
<ns0:Content>
<html:p>
(a)
<html:span class="EnSpace"/>
Electrical corporations may apply to the commission for an order determining that the costs identified in Sections 367, 368, 375, and 376 not be collected from a particular class of customer or category of electricity consumption.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
Subject to the fire wall specified in subdivision (e) of Section 367, this section and Sections 372 and 374 shall apply in the event the commission authorizes a nonbypassable charge before the
implementation of an Independent System Operator
referred to in subdivision (a) of Section 365.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_33B51639-78DD-4DD2-A2E8-881F49BFEF76">
<ns0:Num>SEC. 15.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'376.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 376 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_72489EA0-1861-40DA-BD36-78A177C5516D">
<ns0:Num>376.</ns0:Num>
<ns0:LawSectionVersion id="id_74B5489E-CA4E-4907-A64B-AD094106DB0D">
<ns0:Content>
<html:p>To the extent that the costs of programs to accommodate implementation of direct access and the Independent System Operator that have been funded by an electrical corporation and have been found by the commission or the Federal Energy Regulatory Commission to be recoverable from the utility’s customers, reduce an electrical corporation’s opportunity to recover its utility generation-related plant
and regulatory assets by the end of the year 2001, the electrical corporation may recover unrecovered utility generation-related plant and regulatory assets after December 31, 2001, in an amount equal to the utility’s cost of commission-approved or Federal Energy Regulatory Commission approved restructuring-related implementation programs. An electrical corporation’s ability to collect the amounts from retail customers after the year 2001 shall be reduced to the extent the Independent System Operator reimburses the electrical corporation for the costs of any of these programs.</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_6FDA746D-3F8F-440D-8208-B8D92E2A7F1C">
<ns0:Num>SEC. 16.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PUC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'PART'%20and%20caml%3ANum%3D'1.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'2.3.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'ARTICLE'%20and%20caml%3ANum%3D'10.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'390.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 390 of the
<ns0:DocName>Public Utilities Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_4869E21B-8702-48F2-8EAA-E58BCA3267BA">
<ns0:Num>390.</ns0:Num>
<ns0:LawSectionVersion id="id_E4B15012-2605-4BA9-9A38-F0BC8EDDED14">
<ns0:Content>
<html:p>
(a)
<html:span class="EnSpace"/>
Subject to applicable contractual terms, energy prices paid to nonutility power generators by an electrical corporation based on the commission’s prescribed “short run avoided cost energy methodology” shall be determined as set forth in
subdivision (b).
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
Short run avoided cost energy payments paid to nonutility power generators by an electrical corporation shall be based on a formula that reflects a starting energy price, adjusted monthly to reflect changes in a starting gas index price in relation to an average of current California natural gas border price indices. The starting energy price shall be based on 12-month averages of recent, pre-January 1, 1996, short-run avoided energy prices paid by each electrical corporation to nonutility power generators. The starting gas index
price shall be established as an average of index gas prices for the same annual periods.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
Short-run avoided energy cost payments made pursuant to this section are in addition to contractually specified capacity payments. This section does not affect, modify, or amend the terms and conditions of existing nonutility power generators’ contracts with respect to the sale of energy or capacity or otherwise.
</html:p>
<html:p>
(d)
<html:span class="EnSpace"/>
This section does not limit the level of transition cost recovery provided to utilities under electric industry restructuring policies established by the commission.
</html:p>
<html:p>
(e)
<html:span class="EnSpace"/>
(1)
<html:span class="EnSpace"/>
The term “going forward costs” shall include, but not be limited to, all costs associated with fuel transportation and fuel supply, administrative and general, and operation and
maintenance.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
The following shall not be considered “going forward costs”:
</html:p>
<html:p>
(A)
<html:span class="EnSpace"/>
Commission-approved capital costs for capital additions to fossil-fueled powerplants, if
such additions are necessary for the continued operation of the powerplants used to meet load and such additions are not undertaken primarily to expand, repower, or enhance the efficiency of plant operations.
</html:p>
<html:p>
(B)
<html:span class="EnSpace"/>
Commission-approved
operating costs for particular utility-owned powerplant units and at particular times when reactive power/voltage support is not yet procurable at market-based rates in locations where it is needed, if the recovery shall end on December 31, 2001.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
</ns0:Bill>
</ns0:MeasureDoc>
|