Bill Full Text
Home
-
Bills
-
Bill
-
Authors
-
Dates
-
Locations
-
Analyses
-
Organizations
<?xml version="1.0" ?>
<ns0:MeasureDoc xmlns:html="http://www.w3.org/1999/xhtml" xmlns:ns0="http://lc.ca.gov/legalservices/schemas/caml.1#" xmlns:ns3="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" version="1.0" xsi:schemaLocation="http://lc.ca.gov/legalservices/schemas/caml.1# xca.1.xsd">
<ns0:Description>
<ns0:Id>20250SB__135099INT</ns0:Id>
<ns0:VersionNum>99</ns0:VersionNum>
<ns0:History>
<ns0:Action>
<ns0:ActionText>INTRODUCED</ns0:ActionText>
<ns0:ActionDate>2026-02-20</ns0:ActionDate>
</ns0:Action>
</ns0:History>
<ns0:LegislativeInfo>
<ns0:SessionYear>2025</ns0:SessionYear>
<ns0:SessionNum>0</ns0:SessionNum>
<ns0:MeasureType>SB</ns0:MeasureType>
<ns0:MeasureNum>1350</ns0:MeasureNum>
<ns0:MeasureState>INT</ns0:MeasureState>
</ns0:LegislativeInfo>
<ns0:AuthorText authorType="LEAD_AUTHOR">Introduced by Senator McNerney</ns0:AuthorText>
<ns0:Authors>
<ns0:Legislator>
<ns0:Contribution>LEAD_AUTHOR</ns0:Contribution>
<ns0:House>SENATE</ns0:House>
<ns0:Name>McNerney</ns0:Name>
</ns0:Legislator>
</ns0:Authors>
<ns0:Title> An act to amend Section 25741 of the Public Resources Code, relating to energy. </ns0:Title>
<ns0:RelatingClause>energy</ns0:RelatingClause>
<ns0:GeneralSubject>
<ns0:Subject>Energy: renewable electrical generation facilities: definition.</ns0:Subject>
</ns0:GeneralSubject>
<ns0:DigestText>
<html:p>Existing law defines a “renewable electrical generation facility” as a facility that uses biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells or linear generators that use specified fuels, small hydroelectric generation of 30 megawatts or less, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and that meets other specified requirements. Existing law incorporates that definition into various programs, including the California Renewables Portfolio Standard Program, which requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, as defined, to procure a minimum quantity of electricity products from electrical generating facilities that meet that definition of “renewable electrical generation facility,” and the net energy metering program, in which residential
customers, small commercial customers, and commercial, industrial, or agricultural customers of an electrical utility, who use renewable electrical generation facilities, are eligible to participate, as specified.</html:p>
<html:p>This bill would revise the definition of “renewable electrical generation facility” to include a facility that uses turbines that use specified fuels.</html:p>
<html:p>Under existing law, a violation of any order, decision, rule, direction, demand, or requirement of the commission is a crime.</html:p>
<html:p>Because a violation of a commission action implementing this bill’s requirements would be a crime, the bill would impose a state-mandated local program.</html:p>
<html:p>The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making
that reimbursement.</html:p>
<html:p>This bill would provide that no reimbursement is required by this act for a specified reason.</html:p>
</ns0:DigestText>
<ns0:DigestKey>
<ns0:VoteRequired>MAJORITY</ns0:VoteRequired>
<ns0:Appropriation>NO</ns0:Appropriation>
<ns0:FiscalCommittee>YES</ns0:FiscalCommittee>
<ns0:LocalProgram>YES</ns0:LocalProgram>
</ns0:DigestKey>
<ns0:MeasureIndicators>
<ns0:ImmediateEffect>NO</ns0:ImmediateEffect>
<ns0:ImmediateEffectFlags>
<ns0:Urgency>NO</ns0:Urgency>
<ns0:TaxLevy>NO</ns0:TaxLevy>
<ns0:Election>NO</ns0:Election>
<ns0:UsualCurrentExpenses>NO</ns0:UsualCurrentExpenses>
<ns0:BudgetBill>NO</ns0:BudgetBill>
<ns0:Prop25TrailerBill>NO</ns0:Prop25TrailerBill>
</ns0:ImmediateEffectFlags>
</ns0:MeasureIndicators>
</ns0:Description>
<ns0:Bill id="bill">
<ns0:Preamble>The people of the State of California do enact as follows:</ns0:Preamble>
<ns0:BillSection id="id_EB388029-859F-492A-B447-0DCC42AF0DA5">
<ns0:Num>SECTION 1.</ns0:Num>
<ns0:ActionLine action="IS_AMENDED" ns3:type="locator" ns3:href="urn:caml:codes:PRC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'15.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'8.6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'25741.'%5D)" ns3:label="fractionType: LAW_SECTION">
Section 25741 of the
<ns0:DocName>Public Resources Code</ns0:DocName>
is amended to read:
</ns0:ActionLine>
<ns0:Fragment>
<ns0:LawSection id="id_7F0D4CFC-2DD2-41FE-9D80-C77045B54999">
<ns0:Num>25741.</ns0:Num>
<ns0:LawSectionVersion id="id_4F193331-8876-48A5-AA65-24668AAB6E66">
<ns0:Content>
<html:p>As used in this chapter, the following definitions apply:</html:p>
<html:p>
(a)
<html:span class="EnSpace"/>
“Renewable electrical generation facility” means a facility that meets all of the following criteria:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
The facility uses biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells or linear generators using fuels described in this paragraph that otherwise meet the requirements of this subdivision, turbines using fuels described in this paragraph that otherwise meet the requirements of this subdivision, small hydroelectric generation of 30 megawatts or less, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal,
or tidal current, and any additions or enhancements to the facility using that technology.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
The facility satisfies one of the following requirements:
</html:p>
<html:p>
(A)
<html:span class="EnSpace"/>
The facility is located in the state or near the border of the state with the first point of connection to the transmission network of a balancing authority area primarily located within the state. For purposes of this subparagraph, “balancing authority area” has the same meaning as defined in Section 399.12 of the Public Utilities Code.
</html:p>
<html:p>
(B)
<html:span class="EnSpace"/>
The facility has its first point of interconnection to the transmission network outside the state, within the Western Electricity Coordinating Council (WECC) service area, and satisfies all of the following requirements:
</html:p>
<html:p>
(i)
<html:span class="EnSpace"/>
It commences initial commercial
operation after January 1, 2005.
</html:p>
<html:p>
(ii)
<html:span class="EnSpace"/>
It will not cause or contribute to a violation of a California environmental quality standard or requirement.
</html:p>
<html:p>
(iii)
<html:span class="EnSpace"/>
It participates in the accounting system to verify compliance with the renewables portfolio standard established by the commission pursuant to subdivision (b) of Section 399.25 of the Public Utilities Code.
</html:p>
<html:p>
(C)
<html:span class="EnSpace"/>
The facility meets the requirements of clauses (ii) and (iii) of subparagraph (B), but does not meet the requirements of clause (i) of subparagraph (B) because it commenced initial operation before January 1, 2005, if the facility satisfies either of the following
requirements:
</html:p>
<html:p>
(i)
<html:span class="EnSpace"/>
The electricity is from incremental generation resulting from expansion or repowering of the facility.
</html:p>
<html:p>
(ii)
<html:span class="EnSpace"/>
Electricity generated by the facility was procured by a retail seller or local publicly owned electric utility as of January 1, 2010.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
If the facility is outside the United States, it is developed and operated in a manner that is as protective of the environment as a similar facility located in the state.
</html:p>
<html:p>
(4)
<html:span class="EnSpace"/>
If eligibility of the facility is based on the use of landfill gas, digester gas, or another renewable fuel delivered to the facility through a common carrier pipeline, the transaction for the procurement of that fuel, including the source of the fuel and delivery method, satisfies the requirements of Section 399.12.6 of
the Public Utilities Code and is verified pursuant to the accounting system established by the commission pursuant to Section 399.25 of the Public Utilities Code, or a comparable system, as determined by the commission.
</html:p>
<html:p>
(b)
<html:span class="EnSpace"/>
“Municipal solid waste conversion” means a technology that uses a noncombustion thermal process to convert solid waste to a clean-burning fuel for the purpose of generating electricity, and that meets all of the following criteria:
</html:p>
<html:p>
(1)
<html:span class="EnSpace"/>
The technology does not use air or oxygen in the conversion process, except ambient air to maintain temperature control.
</html:p>
<html:p>
(2)
<html:span class="EnSpace"/>
The technology produces no discharges of air contaminants or emissions, including greenhouse gases as defined in Section 38505 of the Health and Safety Code.
</html:p>
<html:p>
(3)
<html:span class="EnSpace"/>
The technology
produces no discharges to surface or groundwaters of the state.
</html:p>
<html:p>
(4)
<html:span class="EnSpace"/>
The technology produces no hazardous wastes.
</html:p>
<html:p>
(5)
<html:span class="EnSpace"/>
To the maximum extent feasible, the technology removes all recyclable materials and marketable green waste compostable materials from the solid waste stream before the conversion process and the owner or operator of the facility certifies that those materials will be recycled or composted.
</html:p>
<html:p>
(6)
<html:span class="EnSpace"/>
The facility at which the technology is used is in compliance with all applicable laws, regulations, and ordinances.
</html:p>
<html:p>
(7)
<html:span class="EnSpace"/>
The technology meets any other conditions established by the commission.
</html:p>
<html:p>
(8)
<html:span class="EnSpace"/>
The facility certifies that any local agency sending solid waste to the facility
diverted at least 30 percent of all solid waste it collects through solid waste reduction, recycling, and composting. For purposes of this paragraph, “local agency” means any city, county, or special district, or subdivision thereof, that is authorized to provide solid waste handling services.
</html:p>
<html:p>
(c)
<html:span class="EnSpace"/>
“Renewable energy public goods charge” means that portion of the nonbypassable system benefits charge required to be collected to fund renewable energy pursuant to the Reliable Electric Service Investments Act (Article 15 (commencing with Section 399) of Chapter 2.3 of Part 1 of Division 1 of the Public Utilities Code).
</html:p>
<html:p>
(d)
<html:span class="EnSpace"/>
“Report” means the report entitled “Investing in Renewable Electricity Generation in California” (June 2001, Publication Number P500-00-022) submitted to the Governor and the Legislature by the commission.
</html:p>
<html:p>
(e)
<html:span class="EnSpace"/>
“Retail seller” has the same meaning as defined in Section 399.12 of the Public Utilities Code.
</html:p>
</ns0:Content>
</ns0:LawSectionVersion>
</ns0:LawSection>
</ns0:Fragment>
</ns0:BillSection>
<ns0:BillSection id="id_148BC4A1-9E7C-4A02-828B-7356084A1387">
<ns0:Num>SEC. 2.</ns0:Num>
<ns0:Content>
<html:p>
No reimbursement is required by this act pursuant to Section 6 of Article XIII
<html:span class="ThinSpace"/>
B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII
<html:span class="ThinSpace"/>
B of the California Constitution.
</html:p>
</ns0:Content>
</ns0:BillSection>
</ns0:Bill>
</ns0:MeasureDoc>