Session:   
Updated:   2026-02-23

Bill Full Text

Home - Bills - Bill - Authors - Dates - Locations - Analyses - Organizations

<?xml version="1.0" ?>
<ns0:MeasureDoc xmlns:html="http://www.w3.org/1999/xhtml" xmlns:ns0="http://lc.ca.gov/legalservices/schemas/caml.1#" xmlns:ns3="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" version="1.0" xsi:schemaLocation="http://lc.ca.gov/legalservices/schemas/caml.1# xca.1.xsd">
        


        <ns0:Description>
                <ns0:Id>20250AB__175799INT</ns0:Id>
                <ns0:VersionNum>99</ns0:VersionNum>
                <ns0:History>
                        <ns0:Action>
                                <ns0:ActionText>INTRODUCED</ns0:ActionText>
                                <ns0:ActionDate>2026-02-09</ns0:ActionDate>
                        </ns0:Action>
                </ns0:History>
                <ns0:LegislativeInfo>
                        <ns0:SessionYear>2025</ns0:SessionYear>
                        <ns0:SessionNum>0</ns0:SessionNum>
                        <ns0:MeasureType>AB</ns0:MeasureType>
                        <ns0:MeasureNum>1757</ns0:MeasureNum>
                        <ns0:MeasureState>INT</ns0:MeasureState>
                </ns0:LegislativeInfo>
                <ns0:AuthorText authorType="LEAD_AUTHOR">Introduced by Assembly Member Gallagher</ns0:AuthorText>
                <ns0:Authors>
                        <ns0:Legislator>
                                <ns0:Contribution>LEAD_AUTHOR</ns0:Contribution>
                                <ns0:House>ASSEMBLY</ns0:House>
                                <ns0:Name>Gallagher</ns0:Name>
                        </ns0:Legislator>
                </ns0:Authors>
                <ns0:Title>An act to amend Section 25524.1 of the Public Resources Code, relating to energy. </ns0:Title>
                <ns0:RelatingClause>energy</ns0:RelatingClause>
                <ns0:GeneralSubject>
                        <ns0:Subject>Energy: nuclear facilities.</ns0:Subject>
                </ns0:GeneralSubject>
                <ns0:DigestText>
                        <html:p>Existing law prohibits the State Energy Resources Conservation and Development Commission from certifying a nuclear fission thermal powerplant, except for specified powerplants, and provides that a nuclear fission thermal powerplant, except specified powerplants, is not a permitted land use in California unless certain conditions are met regarding the existence of technology for the construction and operation of nuclear fuel rod processing plants, as specified.</html:p>
                        <html:p>This bill would make nonsubstantive changes to that provision.</html:p>
                </ns0:DigestText>
                <ns0:DigestKey>
                        <ns0:VoteRequired>MAJORITY</ns0:VoteRequired>
                        <ns0:Appropriation>NO</ns0:Appropriation>
                        <ns0:FiscalCommittee>NO</ns0:FiscalCommittee>
                        <ns0:LocalProgram>NO</ns0:LocalProgram>
                </ns0:DigestKey>
                <ns0:MeasureIndicators>
                        <ns0:ImmediateEffect>NO</ns0:ImmediateEffect>
                        <ns0:ImmediateEffectFlags>
                                <ns0:Urgency>NO</ns0:Urgency>
                                <ns0:TaxLevy>NO</ns0:TaxLevy>
                                <ns0:Election>NO</ns0:Election>
                                <ns0:UsualCurrentExpenses>NO</ns0:UsualCurrentExpenses>
                                <ns0:BudgetBill>NO</ns0:BudgetBill>
                                <ns0:Prop25TrailerBill>NO</ns0:Prop25TrailerBill>
                        </ns0:ImmediateEffectFlags>
                </ns0:MeasureIndicators>
        </ns0:Description>
        <ns0:Bill id="bill">
                <ns0:Preamble>The people of the State of California do enact as follows:</ns0:Preamble>
                <ns0:BillSection id="id_29D9B2C5-64FF-4C48-A2DB-AE72D77F5F43">
                        <ns0:Num>SECTION 1.</ns0:Num>
                        <ns0:ActionLine action="IS_AMENDED" ns3:href="urn:caml:codes:PRC:caml#xpointer(%2Fcaml%3ALawDoc%2Fcaml%3ACode%2Fcaml%3ALawHeading%5B%40type%3D'DIVISION'%20and%20caml%3ANum%3D'15.'%5D%2Fcaml%3ALawHeading%5B%40type%3D'CHAPTER'%20and%20caml%3ANum%3D'6.'%5D%2Fcaml%3ALawSection%5Bcaml%3ANum%3D'25524.1.'%5D)" ns3:label="fractionType: LAW_SECTION" ns3:type="locator">
                                Section 25524.1 of the
                                <ns0:DocName>Public Resources Code</ns0:DocName>
                                 is amended to read:
                        </ns0:ActionLine>
                        <ns0:Fragment>
                                <ns0:LawSection id="id_94C3E157-CB21-4AC7-8E4A-F743468D8DB0">
                                        <ns0:Num>25524.1.</ns0:Num>
                                        <ns0:LawSectionVersion id="id_D96C6D88-0BE8-4F37-89FE-EB395ADFB4D1">
                                                <ns0:Content>
                                                        <html:p>
                                                                (a)
                                                                <html:span class="EnSpace"/>
                                                                Except for the existing Diablo Canyon Units 1 and 2 owned by Pacific Gas and Electric Company and San Onofre Units 2 and 3 owned by Southern California Edison Company and San Diego Gas and Electric Company, a nuclear fission thermal powerplant requiring the reprocessing of fuel rods, including any to which this chapter does not otherwise apply, except those having a vested right as defined in this section, shall not be a permitted land use in the state or, where applicable, certified by the commission until both of the following conditions are met:
                                                        </html:p>
                                                        <html:p>
                                                                (1)
                                                                <html:span class="EnSpace"/>
                                                                The commission finds that the United States through its authorized agency has identified and approved, and there exists a technology for the construction and operation of, nuclear fuel rod reprocessing plants.
                                                        </html:p>
                                                        <html:p>
                                                                (2)
                                                                <html:span class="EnSpace"/>
                                                                (A)
                                                                <html:span class="EnSpace"/>
                                                                The commission has reported its findings and the reasons therefor pursuant to paragraph (1) to the Legislature. That report shall be assigned to the appropriate policy committees for review. The commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings unless within those 100 legislative days either house of the Legislature adopts by a majority vote of its members a resolution disaffirming the findings of the commission made pursuant to paragraph (1).
                                                        </html:p>
                                                        <html:p>
                                                                (B)
                                                                <html:span class="EnSpace"/>
                                                                A resolution of disaffirmance shall set forth the reasons for the action and shall provide, to the extent possible, guidance to the commission as to an appropriate method of bringing the commission’s findings into conformance with paragraph (1).
                                                        </html:p>
                                                        <html:p>
                                                                (C)
                                                                <html:span class="EnSpace"/>
                                                                If a disaffirming resolution is adopted, the commission shall reexamine its original findings consistent with matters raised in the resolution. On conclusion of its reexamination, the commission shall transmit its findings in writing, with the reasons therefor, to the Legislature.
                                                        </html:p>
                                                        <html:p>
                                                                (D)
                                                                <html:span class="EnSpace"/>
                                                                If the findings are that the conditions of paragraph (1) have been met, the commission may proceed to certify nuclear fission thermal powerplants 100 legislative days after reporting its findings to the Legislature unless within those 100 legislative days both houses of the Legislature act by statute to declare the findings null and void and takes appropriate action.
                                                        </html:p>
                                                        <html:p>
                                                                (E)
                                                                <html:span class="EnSpace"/>
                                                                To allow sufficient time for the Legislature to act, the reports of findings of the commission shall be submitted to the Legislature at least six calendar months before the adjournment of the Legislature sine die.
                                                        </html:p>
                                                        <html:p>
                                                                (b)
                                                                <html:span class="EnSpace"/>
                                                                The commission shall further find on a case-by-case basis that facilities with adequate capacity to reprocess nuclear fuel rods from a certified nuclear facility or to store that fuel if that storage is approved by an authorized agency of the United States are in actual operation or will be in operation at the time that the nuclear facility requires reprocessing or storage if the storage of fuel is in an offsite location to the extent necessary to provide continuous onsite full core reserve storage capacity.
                                                        </html:p>
                                                        <html:p>
                                                                (c)
                                                                <html:span class="EnSpace"/>
                                                                The commission shall continue to receive and process notices of intention and applications for certification pursuant to this division, but shall not issue a decision pursuant to Section 25523 granting a certificate until the requirements of this section have been met. All other permits, licenses, approvals, or authorizations for the entry or use of the land, including orders of court, that may be required may be processed and granted by the governmental entity concerned, but construction work to install permanent equipment or structures shall not commence until the requirements of this section have been met.
                                                        </html:p>
                                                </ns0:Content>
                                        </ns0:LawSectionVersion>
                                </ns0:LawSection>
                        </ns0:Fragment>
                </ns0:BillSection>
        </ns0:Bill>
</ns0:MeasureDoc>